Difference between revisions of "LB May 2017 Irradiation Day"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| Line 2: | Line 2: | ||
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482  | DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482  | ||
| + | |||
| Line 12: | Line 13: | ||
|-  | |-  | ||
|}  | |}  | ||
| + | |||
| + | Beam On:  | ||
| + | |||
| + | Beam Off:  | ||
| + | |||
| + | Timer to Start Counting:  | ||
Timing Cut Information for 50% Se Run (based on Det B time)  | Timing Cut Information for 50% Se Run (based on Det B time)  | ||
Revision as of 14:17, 23 May 2017
32 MeV Beam 100 mA current Pulse Width 2.2 us
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482
50% Se Soil Mix
| Date | Sample | Document Title | Start | Stop | Runtime (s) | Position | 
| 5/23/17 | 
Beam On:
Beam Off:
Timer to Start Counting:
Timing Cut Information for 50% Se Run (based on Det B time)