Difference between revisions of "LB May 2017 Irradiation Day"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| Line 1: | Line 1: | ||
| − | + | 32 MeV Beam 100 mA current Pulse Width 2.2 us  | |
Revision as of 13:28, 23 May 2017
32 MeV Beam 100 mA current Pulse Width 2.2 us
50% Se Soil Mix
| Date | Sample | Document Title | Start | Stop | Runtime (s) | Position | 
| 5/23/17 | 
Timing Cut Information for 50% Se Run (based on Det B time)