| Run # ||D90 n Rate (Counts/pulse)|| Configuration | | Run # ||D90 n Rate (Counts/pulse)|| Configuration | ||
|- | |- | ||
− | |5302 || || 11.1 MeV , 2 ns pulse width , 450 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is '''DU''' , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Installed 3rd collimator wall, D30 has one 1/16" thick lead curtain [[File:Rate2nC_5302.png|40px]] | + | |5302 || || 11.1 MeV , 2 ns pulse width , 450 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is '''DU''' , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Installed 3rd collimator wall, D30 has one 1/16" thick lead curtain [[File:Rate2nC_5302.png|40px]][[File:Run5302_ToF_Histograms.png|40px]] |
|- | |- | ||
− | |5303 || || 11.1 MeV , 2 ns pulse width , 450 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is DU , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Installed 3rd collimator wall, D30 has '''NO''' lead curtain [[File:Rate2nC_5303.png|40px]] | + | |5303 || || 11.1 MeV , 2 ns pulse width , 450 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is DU , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Installed 3rd collimator wall, D30 has '''NO''' lead curtain [[File:Rate2nC_5303.png|40px]][[File:Run5303_ToF_Histograms.png|40px]] |
|- | |- | ||
|} | |} | ||
Line 17: | Line 17: | ||
| Run # ||D90 n Rate (Counts/pulse)|| Configuration | | Run # ||D90 n Rate (Counts/pulse)|| Configuration | ||
|- | |- | ||
− | |5300 || || 11.1 MeV , 2 ns pulse width , 450 mA , 200 Hz , Accelerator side collimator open to '''0.2563 cm''', Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is Empty , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,[[File:Rate2nC_5300.png|40px]] | + | |5300 || || 11.1 MeV , 2 ns pulse width , 450 mA , 200 Hz , Accelerator side collimator open to '''0.2563 cm''', Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is Empty , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,[[File:Rate2nC_5300.png|40px]][[File:Run5300_ToF_Histograms.png|40px]] |
|- | |- | ||
− | |5301 || || 11.1 MeV , 2 ns pulse width , 450 mA , 200 Hz , Accelerator side collimator open to '0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is Empty , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand, '''Installed 3rd collimator wall''', removed line of site between D30 and cell wall collimator [[File:Rate2nC_5301.png|40px]] | + | |5301 || || 11.1 MeV , 2 ns pulse width , 450 mA , 200 Hz , Accelerator side collimator open to '0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is Empty , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand, '''Installed 3rd collimator wall''', removed line of site between D30 and cell wall collimator [[File:Rate2nC_5301.png|40px]][[File:Run5301_ToF_Histograms.png|40px]] |
|- | |- | ||
− | |5305 || || 11.1 MeV , 2 ns pulse width , 300 mA , '''90 Hz''' , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is '''EMPTY''' , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,'''Removed 3rd collimator wall''', D30 has NO thick lead curtain, [[File:Rate2nC_5305.png|40px]] | + | |5305 || || 11.1 MeV , 2 ns pulse width , 300 mA , '''90 Hz''' , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is '''EMPTY''' , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,'''Removed 3rd collimator wall''', D30 has NO thick lead curtain, [[File:Rate2nC_5305.png|40px]][[File:Run5305_ToF_Histograms.png|40px]] |
|- | |- | ||
− | |5306 || || 11.1 MeV , 2 ns pulse width , 300 mA , '''200 Hz''' , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, [[File:Rate2nC_5306.png|40px]] | + | |5306 || || 11.1 MeV , 2 ns pulse width , 300 mA , '''200 Hz''' , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, [[File:Rate2nC_5306.png|40px]][[File:Run5306_ToF_Histograms.png|40px]] |
|- | |- | ||
− | |5307 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, [[File:Rate2nC_5307.png|40px]] | + | |5307 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, [[File:Rate2nC_5307.png|40px]][[File:Run5307_ToF_Histograms.png|40px]] |
|- | |- | ||
− | |5308 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is '''~0.5 mm x 7 cm x 4 mm Thorium''' , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, [[File:Rate2nC_5308.png|40px]] | + | |5308 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is '''~0.5 mm x 7 cm x 4 mm Thorium''' , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, [[File:Rate2nC_5308.png|40px]][[File:Run5308_ToF_Histograms.png|40px]] |
|- | |- | ||
− | |5312 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is '''EMPTY''' , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, Install 16" deep x24" wide x 14" high ALuminium photon''' beam dump'''. Beam upstream side of dump is 37" from wall[[File:Rate2nC_5312.png|40px]] | + | |5312 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is '''EMPTY''' , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, Install 16" deep x24" wide x 14" high ALuminium photon''' beam dump'''. Beam upstream side of dump is 37" from wall[[File:Rate2nC_5312.png|40px]][[File:Run5312_ToF_Histograms.png|40px]] |
|- | |- | ||
− | |5313 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace aluminium dump with a half lead brick ''' centered on 2" wide beam''' left right[[File:Rate2nC_5313.png|40px]] | + | |5313 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace aluminium dump with a half lead brick ''' centered on 2" wide beam''' left right[[File:Rate2nC_5313.png|40px]][[File:Run5313_ToF_Histograms.png|40px]] |
|- | |- | ||
− | |5314 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace aluminium dump with a half lead brick '''centered 4" from beam''' center [[File:Rate2nC_5314.png|40px]] | + | |5314 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace aluminium dump with a half lead brick '''centered 4" from beam''' center [[File:Rate2nC_5314.png|40px]][[File:Run5314_ToF_Histograms.png|40px]] |
|- | |- | ||
− | |5315 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace aluminium dump with a half lead brick '''centered 2" from beam''' center [[File:Rate2nC_5315.png|40px]]| | + | |5315 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace aluminium dump with a half lead brick '''centered 2" from beam''' center [[File:Rate2nC_5315.png|40px]][[File:Run5315_ToF_Histograms.png|40px]] |
|- | |- | ||
− | |5316 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace half lead brick with battle ship steel 17" high 24" deep and 4" beam left right [[File:Rate2nC_5316.png|40px]] | + | |5316 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace half lead brick with battle ship steel 17" high 24" deep and 4" beam left right [[File:Rate2nC_5316.png|40px]][[File:Run5316_ToF_Histograms.png|40px]] |
− | |||
− | |||
|- | |- | ||
|} | |} | ||
Line 51: | Line 49: | ||
| Run # ||D90 n Rate (Counts/pulse)|| Configuration | | Run # ||D90 n Rate (Counts/pulse)|| Configuration | ||
|- | |- | ||
− | |5309 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is '''EMPTY''' , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, '''Veto OUT'''[[File:Rate2nC_5309.png|40px]] | + | |5309 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is '''EMPTY''' , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, '''Veto OUT'''[[File:Rate2nC_5309.png|40px]][[File:Run5309_ToF_Histograms.png|40px]] |
|- | |- | ||
− | |5310 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, '''Veto IN'''[[File:Rate2nC_5310.png|40px]] | + | |5310 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, '''Veto IN'''[[File:Rate2nC_5310.png|40px]][[File:Run5310_ToF_Histograms.png|40px]] |
|- | |- | ||
|} | |} | ||
Line 62: | Line 60: | ||
| Run # ||D90 n Rate (Counts/pulse)|| Configuration | | Run # ||D90 n Rate (Counts/pulse)|| Configuration | ||
|- | |- | ||
− | |5316 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace half lead brick with battle ship steel 17" high 24" deep and 4" beam left right [[File:Rate2nC_5316.png|40px]] | + | |5316 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is '''EMPTY''' , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace half lead brick with battle ship steel 17" high 24" deep and 4" beam left right [[File:Rate2nC_5316.png|40px]][[File:Run5316_ToF_Histograms.png|40px]] |
|- | |- | ||
− | |5317 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is '''Thorium plate''' orthogonal to beam (90) , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace half lead brick with battle ship steel 17" high 24" deep and 4" beam left right [[File: | + | |5317 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is '''Thorium plate''' orthogonal to beam (90) , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace half lead brick with battle ship steel 17" high 24" deep and 4" beam left right [[File:Rate2nC_5317.png|40px]][[File:Run5317_ToF_Histograms.png|40px]] |
|- | |- | ||
− | |5318 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator wide open '''to 8 mm slit''', Cell side collimator '''OPEN to 7.5 cm''' , radiator 3/4" IN , Target is Thorium plate orthogonal to beam (90) , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace half lead brick with battle ship steel 17" high 24" deep and 4" beam left right [[File: | + | |5318 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator wide open '''to 8 mm slit''', Cell side collimator '''OPEN to 7.5 cm''' , radiator 3/4" IN , Target is Thorium plate orthogonal to beam (90) , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace half lead brick with battle ship steel 17" high 24" deep and 4" beam left right [[File:Rate2nC_5318.png|40px]][[File:Run5318_ToF_Histograms.png|40px]] |
|- | |- | ||
+ | |5319 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator wide open to 8 mm slit, Cell side collimator OPEN to 7.5 cm , radiator '''1.5" IN''' , Target is Thorium plate orthogonal to beam (90) , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace half lead brick with battle ship steel 17" high 24" deep and 4" beam left right [[File:Rate2nC_5319.png|40px]][[File:Run5319_ToF_Histograms.png|40px]] | ||
+ | |- | ||
+ | |5320 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator wide open to 8 mm slit, Cell side collimator OPEN to 7.5 cm , radiator 1.5" IN , Target is '''EMPTY''' , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace half lead brick with battle ship steel 17" high 24" deep and 4" beam left right [[File:Rate2nC_5320.png|40px]][[File:Run5320_ToF_Histograms.png|40px]] | ||
+ | |- | ||
+ | |5321 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator wide open to 8 mm slit, Cell side collimator OPEN to 7.5 cm , radiator 1.5" IN , Target is '''Thorium plate''' orthogonal to beam (90) , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace half lead brick with battle ship steel 17" high 24" deep and 4" beam left right [[File:Rate2nC_5321.png|40px]][[File:Run5321_ToF_Histograms.png|40px]] Target in minus target out -> [[File:TargetInMinusOut(runs5321and5320).png|60px]] | ||
+ | |- | ||
+ | |5322 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator wide open to 8 mm slit, Cell side collimator OPEN to 7.5 cm , radiator 1.5" IN , Target is '''Empty''' orthogonal to beam (90) , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace half lead brick with battle ship steel 17" high 24" deep and 4" beam left right [[File:Rate2nC_5322.png|40px]][[File:Run5322_ToF_Histograms.png|40px]] | ||
+ | |- | ||
+ | |5323 || || 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator wide open to 8 mm slit, Cell side collimator OPEN to 7.5 cm , radiator 1.5" IN , Target is '''Empty''' orthogonal to beam (90) , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace half lead brick with battle ship steel 17" high 24" deep and 4" beam left right, 1" Al brick on end to have 4" of Al at exit of tunnel of love [[File:Rate2nC_5323.png|40px]][[File:Run5323_ToF_Histograms.png|40px]] | ||
+ | |||
|} | |} | ||
+ | |||
+ | =End of Run summary= | ||
+ | |||
+ | #The back wall was a source of photons that can be reduced best with blinders | ||
+ | #The ToF spectrum needs better separation between gamma flash and neutrons, Move detectors back? | ||
+ | #The tunnel of love reduced the photon singles rate by about 10% for D120 & D150 (compare runs 5300 & 5301). | ||
+ | #Opening the collimator slit fully caused gamma flash to appear close to the neutron ToF | ||
+ | #Neutron singles rate in D225 was within the desired rate of 2e-3 n/pulse for a thorium plate target at 90 degrees to the beam | ||
+ | #D30's rate decreases by a factor of three for every inch of lead shielding added to the front | ||
+ | #pair spectrometer magnet has little impact on detector background | ||
+ | #beam tuning may increase photon flash. | ||
+ | #determine collimator size to produce photon cone that is contained within the photon dump (blinders) | ||
+ | #cleanup collimator inside wall separating accelerator room and experimental cell | ||
=No target run= | =No target run= | ||
Line 78: | Line 99: | ||
= Long run on Thorium= | = Long run on Thorium= | ||
= Long run on 1 mg HEU= | = Long run on 1 mg HEU= | ||
+ | |||
+ | =Pictures= | ||
+ | [[Pictures(09-09-2016)]] | ||
[[2nCor_44#Run_Plan]] | [[2nCor_44#Run_Plan]] |
Latest revision as of 20:58, 27 September 2016
Study forward detector gamma flash
with Pb curtains
Run # | D90 n Rate (Counts/pulse) | Configuration |
5302 | 11.1 MeV , 2 ns pulse width , 450 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is DU , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Installed 3rd collimator wall, D30 has one 1/16" thick lead curtain 40px | |
5303 | 11.1 MeV , 2 ns pulse width , 450 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is DU , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Installed 3rd collimator wall, D30 has NO lead curtain 40px |
Shielding & Beam dump impact on gamma flash
Run # | D90 n Rate (Counts/pulse) | Configuration |
5300 | 11.1 MeV , 2 ns pulse width , 450 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is Empty , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,40px | |
5301 | 11.1 MeV , 2 ns pulse width , 450 mA , 200 Hz , Accelerator side collimator open to '0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is Empty , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand, Installed 3rd collimator wall, removed line of site between D30 and cell wall collimator 40px | |
5305 | 11.1 MeV , 2 ns pulse width , 300 mA , 90 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, | |
5306 | 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, | |
5307 | 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, | |
5308 | 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is ~0.5 mm x 7 cm x 4 mm Thorium , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, | |
5312 | 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, Install 16" deep x24" wide x 14" high ALuminium photon beam dump. Beam upstream side of dump is 37" from wall | |
5313 | 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace aluminium dump with a half lead brick centered on 2" wide beam left right | |
5314 | 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace aluminium dump with a half lead brick centered 4" from beam center | |
5315 | 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace aluminium dump with a half lead brick centered 2" from beam center | |
5316 | 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, replace half lead brick with battle ship steel 17" high 24" deep and 4" beam left right |
Tuning impact on gamma flash
We set up a veto to create a signal that represented the second peak of the gamma flash in D270 & others. A veto pulse was created for the LED to prevent it from outputing a logic high during the first 20 ns after the beam pulse.
Run # | D90 n Rate (Counts/pulse) | Configuration |
5309 | 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, Veto OUT40px40px | |
5310 | 11.1 MeV , 2 ns pulse width , 300 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is EMPTY , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Removed 3rd collimator wall, D30 has NO thick lead curtain, Veto IN40px40px |
Thorium plate rates.
End of Run summary
- The back wall was a source of photons that can be reduced best with blinders
- The ToF spectrum needs better separation between gamma flash and neutrons, Move detectors back?
- The tunnel of love reduced the photon singles rate by about 10% for D120 & D150 (compare runs 5300 & 5301).
- Opening the collimator slit fully caused gamma flash to appear close to the neutron ToF
- Neutron singles rate in D225 was within the desired rate of 2e-3 n/pulse for a thorium plate target at 90 degrees to the beam
- D30's rate decreases by a factor of three for every inch of lead shielding added to the front
- pair spectrometer magnet has little impact on detector background
- beam tuning may increase photon flash.
- determine collimator size to produce photon cone that is contained within the photon dump (blinders)
- cleanup collimator inside wall separating accelerator room and experimental cell