Difference between revisions of "09-08-2016"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
=Study forward detector gamma flash with Pb curtains= | =Study forward detector gamma flash with Pb curtains= | ||
+ | {| border="1" | ||
+ | | Run # ||D90 n Rate (Counts/pulse)|| Configuration | ||
+ | |- | ||
+ | |5302 || || 11.1 MeV , 2 ns pulse width , 450 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is '''DU''' , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Installed 3rd collimator wall, D30 has one 1/16" thick lead curtain [[File:Rate2nC_5302.png|40px]] | ||
+ | |- | ||
+ | |5303 || || 11.1 MeV , 2 ns pulse width , 450 mA , 200 Hz , Accelerator side collimator open to 0.2563 cm, Cell side collimator OPEN to 2 cm , radiator 3/4" IN , Target is DU , D30 HV changed -1550V, All other detectors at -1700 V, removed pair spectrometer magnet, poly, and stand,Installed 3rd collimator wall, D30 has '''NO''' lead curtain [[File:Rate2nC_5303.png|40px]] | ||
+ | |- | ||
+ | |} | ||
+ | |||
=Thorium strip, collimator squeeze down.= | =Thorium strip, collimator squeeze down.= | ||
=No target run= | =No target run= |