Difference between revisions of "09-07-2016"
Jump to navigation
Jump to search
Line 23: | Line 23: | ||
|5292 || 11.1 MeV , 2 ns pulse width , 850 mA , 200 Hz , Accelerator side collimator open, Cell side collimator closed , '''radiator 1.5" IN''' , Target is 3/4 thick Al @ 90 degree to beam, Block cell on accelerator side [[File:5292.png|40px]] | |5292 || 11.1 MeV , 2 ns pulse width , 850 mA , 200 Hz , Accelerator side collimator open, Cell side collimator closed , '''radiator 1.5" IN''' , Target is 3/4 thick Al @ 90 degree to beam, Block cell on accelerator side [[File:5292.png|40px]] | ||
|- | |- | ||
− | |529 || 11.1 MeV , 2 ns pulse width , 850 mA , 200 Hz , Accelerator side collimator open, Cell side collimator | + | |529 || 11.1 MeV , 2 ns pulse width , 850 mA , 200 Hz , Accelerator side collimator open, '''Cell side collimator OPEN''' , '''radiator 3/4" IN''' , Target is 3/4 thick Al @ 90 degree to beam,''' UNBlock cell on accelerator side''' [[File:5291.png|40px]] |
|- | |- | ||
| || unblock cell , install 1" radiator | | || unblock cell , install 1" radiator |
Revision as of 16:30, 7 September 2016
No target collimator open
- Beam Conditions
- 11.1 MeV , 2 ns pulse width
DU cylinder target
- Beam Conditions
- 11.1 MeV , 2 ns pulse width
1” Al radiator, collimator slit open, HV -1700V,*Find lowest thresholds to run.