Uncategorized pages

Jump to navigation Jump to search

Showing below up to 500 results in range #1 to #500.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. (gamma,f) versus (gamma,f)
  2. -Deuteron photodisintegration kinematics
  3. -Investigate double gamma flash
  4. 03-19-2015
  5. 03-20-2017
  6. 03-21-2017
  7. 03-24-2015
  8. 03-26-2015
  9. 03-27-2015
  10. 03-30-2015
  11. 04-20-2015
  12. 04-21-2015
  13. 04-22-2015
  14. 04-9-2015
  15. 05-1-2017
  16. 05-2-2017
  17. 05-3-2017
  18. 05.21.11
  19. 05/09/2011
  20. 05/09/2011 source test
  21. 05/10/2011
  22. 05/10/2011 source test continue
  23. 05/11/2011
  24. 05/11/2011 n's detector threshold calibration
  25. 05/11/2011 neutron detector threshold calibration
  26. 05/12/2011
  27. 05/12/2011 2n correlation test
  28. 05/12/2011 random coincidence cosmic test
  29. 05/13/2011 PS1 (Tiana) detector threshold calibration
  30. 05/13/2011 coincidence rate test (PS1+PS2 and PS1+PS2+Det1)
  31. 05/13/2011 coincidence test
  32. 05/13/2011 timing test
  33. 05/16/2011 coincidence test
  34. 05/19/2011 n's detector threshold calibration source/(w/source)
  35. 071213
  36. 08/21-22/13
  37. 09-07-2016
  38. 09-07-2017
  39. 09-08-2016
  40. 09-08-2017
  41. 09-09-2016
  42. 09-09-2017
  43. 09-10-2017
  44. 09-11-2017
  45. 09-14-2017
  46. 09-15-2017
  47. 09-16-2017
  48. 09-17-2017
  49. 09-18-2017
  50. 09/23-27/2013
  51. 09122012 JlabShipment
  52. 1-2-07 Tuning
  53. 1-8-08 PrelimResults
  54. 10-29-08 GEM HRRL Photon Runs
  55. 10-30-08 GEM HRRL Photon Runs
  56. 10-31-08 GEM HRRL Photon Runs
  57. 10/30/13 Mayir
  58. 1000 Events per degree in the range 5 to 40 degrees for Lab Frame
  59. 100mA, 100ns pulse width, 100cm from beam pipe, with Titanium window
  60. 100mA, 100ns pulse width, 25cm from beam pipe
  61. 10312013 TestRun
  62. 10mA, 100ns pulse width, 100cm from beam pipe, with Titanium window
  63. 11-10-2016
  64. 11-11-2016
  65. 11/21/2013 Be source
  66. 12-23-2016
  67. 12-GeV NSTAR
  68. 12/09/2013
  69. 12 10 2012 HRRL DetectorTests
  70. 137Cs Shot Log
  71. 170047 50% Se Soil Mixture Analysis
  72. 170048 10% Se Soil Mixture Analysis
  73. 170049 1% Se Soil Mixture Analysis
  74. 170050 0.1% Se Soil Mixture Analysis
  75. 1938:D2O Beam-down
  76. 1938:D2O Beam-down ND TOF
  77. 1938:D2O Beam-down ND TOF calibration
  78. 1938:D2O Beam-down ND energy
  79. 1938:D2O Beam-down ND energy neutronsOnly
  80. 1939:D2O Beam-down
  81. 1939:D2O Beam-down ND TOF
  82. 1939:D2O Beam-down ND TOF calibration
  83. 1939:D2O Beam-down ND energy
  84. 1939:D2O Beam-down ND energy neutronsOnly
  85. 1940:D2O Beam-down
  86. 1940:D2O Beam-down ND TOF
  87. 1940:D2O Beam-down ND TOF calibration
  88. 1940:D2O Beam-down ND energy
  89. 1940:D2O Beam-down ND energy neutronsOnly
  90. 1941:D2O Beam-up
  91. 1941:D2O Beam-up ND TOF
  92. 1941:D2O Beam-up ND TOF calibration
  93. 1941:D2O Beam-up ND energy
  94. 1941:D2O Beam-up ND energy neutronsOnly
  95. 1944:D2O Beam-down
  96. 1944:D2O Beam-down ND TOF
  97. 1944:D2O Beam-down ND TOF calibration
  98. 1944:D2O Beam-down ND energy
  99. 1944:D2O Beam-down ND energy neutronsOnly
  100. 1945:D2O Beam-up
  101. 1945:D2O Beam-up ND TOF
  102. 1945:D2O Beam-up ND TOF calibration
  103. 1945:D2O Beam-up ND energy
  104. 1945:D2O Beam-up ND energy neutronsOnly
  105. 1946:D2O Beam-up Rad-out
  106. 1946:D2O Beam-up Rad-out ND TOF
  107. 1946:D2O Beam-up Rad-out ND TOF calibration
  108. 1946:D2O Beam-up Rad-out ND energy
  109. 1946:D2O Beam-up Rad-out ND energy neutronsOnly
  110. 1947:H2O Beam-up
  111. 1947:H2O Beam-up ND TOF
  112. 1947:H2O Beam-up ND TOF calibration
  113. 1947:H2O Beam-up ND energy
  114. 1947:H2O Beam-up ND energy neutronsOnly
  115. 1948:H2O Beam-down
  116. 1948:H2O Beam-down ND TOF
  117. 1948:H2O Beam-down ND TOF calibration
  118. 1948:H2O Beam-down ND energy
  119. 1948:H2O Beam-down ND energy neutronsOnly
  120. 1949:DU
  121. 1949:DU ND TOF
  122. 1949:DU ND TOF calibration
  123. 1949:DU ND energy
  124. 1949:DU ND energy neutronsOnly
  125. 1 credit vs 9 credits
  126. 2-LTD-brick x-pinch driver
  127. 2-LTD-brick x-pinch driver notes
  128. 2-Neutron Correlation
  129. 2-Neutron Correlation Setup Stuff
  130. 2007 Interns
  131. 2007 Proposal
  132. 2008 NSF Proposal
  133. 2009
  134. 2010
  135. 20101019 BlackRockCanyon
  136. 2011
  137. 20110131 OxfordPeak
  138. 20110626 MirriamLakeIdaho
  139. 201109 R1ProgressRep
  140. 201110 R1ProgressRep
  141. 201111 R1ProgressRep
  142. 201112 R1ProgressRep
  143. 2011 44MeV Analysis 2011
  144. 2011 NSF Proposal
  145. 2012
  146. 201201 R1ProgressRep
  147. 201202 R1ProgressRep
  148. 201203 R1ProgressRep
  149. 201204 R1ProgressRep
  150. 201205 R1ProgressRep
  151. 201206 R1ProgressRep
  152. 201207 R1ProgressRep
  153. 201208 R1ProgressRep
  154. 201209 R1ProgressRep
  155. 201210 R1ProgressRep
  156. 201211 R1ProgressRep
  157. 201212 R1ProgressRep
  158. 2012AnnihCountrRateEstimate
  159. 2012 NSF Proposal
  160. 2012 run DAQ malfunction
  161. 201301 R1ProgressRep
  162. 201302 R1ProgressRep
  163. 201303 R1ProgressRep
  164. 201304 R1ProgressRep
  165. 201305 R1ProgressRep
  166. 201306 R1ProgressRep
  167. 201307 R1ProgressRep
  168. 201308 R1ProgressRep
  169. 201309 R1ProgressRep
  170. 201310 R1ProgressRep
  171. 201311 R1ProgressRep
  172. 201312 R1ProgressRep
  173. 2013 MRI CLAS12 LeveL2Trig
  174. 201401 R1ProgressRep
  175. 201402 R1ProgressRep
  176. 201403 R1ProgressRep
  177. 2015 NSF Proposal
  178. 2018 NSF Proposal
  179. 2020 NSF Proposal
  180. 20min run peak sensing histograms
  181. 252CF
  182. 25MeV Neutron Detector Set-up
  183. 25MeV Neutron Detector Setup
  184. 25mA, 100ns pulse width, 100cm from beam pipe, with Titanium window
  185. 25mA, 100ns pulse width, 25cm from beam pipe
  186. 25mA, 100ns pulse width, 50cm from beam pipe
  187. 25mA, 100ns pulse width, 50cm from beam pipe, tungsten target with aluminum beamstop
  188. 2D Faraday Cup Data Analysis
  189. 2NCorr E1 E2 correlations VS theta abs
  190. 2NCorr Forward Detectors
  191. 2NCorr Photon flux estimate
  192. 2NCorr Rates 2017
  193. 2NCorr SPDP Introduction
  194. 2NCorr SP DP analysis
  195. 2NCorr neutron ToF cut
  196. 2 Bricks Fabrication
  197. 2 LTD bricks driver progress
  198. 2cm XLineTarg 270 Degree Rotation 09/23/16
  199. 2cm XLineTarg 90 Degree Rotation 09/23/16
  200. 2cm XYTarg Z=0 Vx and Vy Differences 09/23/16
  201. 2cm XZTarg Y=0 Vx and Vz Differences 09/23/16
  202. 2cm YLineTarg 0 Degree Rotation 09/23/16
  203. 2cm YLineTarg 180 Degree Rotation 09/23/16
  204. 2cm YLineTarg 210 Degree Rotation 09/23/16
  205. 2cm YLineTarg 30 Degree Rotation 09/23/16
  206. 2cm YZTarg X=0 Vz and Vy Difference 09/23/16
  207. 2nCor 44
  208. 2nCor Equipment
  209. 2n ASCII files
  210. 2n BKG data
  211. 2n Corr JeffsPlots
  212. 2n D2O/H2O/Empty target data
  213. 2n DU data
  214. 2n Detector efficiency test
  215. 2n Equipment
  216. 2n Neutron signal attenuation
  217. 2n Position resolution
  218. 2n TDC map
  219. 2n corr theta VS n-n energies
  220. 2n corr theta VS n-n energies (1)
  221. 2n corr theta VS n-n energies (2)
  222. 2n corr theta VS n-n energies (3)
  223. 2n corr theta VS n-n energies (4)
  224. 2n correlations
  225. 2n correlations in Photofission
  226. 2n geometry of the setup
  227. 2n opening angle
  228. 2n preliminary data analysis
  229. 2n run list
  230. 3N Corr
  231. 4-gradient
  232. 4-momenta
  233. 4-vectors
  234. 40MeV BeamLineInstall 10252013
  235. 44 Linac Exit Geometry
  236. 44 MeV Beam Line Optimization
  237. 44 Setup
  238. 5-19-08
  239. 511 keV photon attenuation in tungsten
  240. 5252017 Anal
  241. 52x48 Steel Table
  242. 5mA, 100ns pulse width, 100cm from beam pipe with Titanium window
  243. 6cm ZLineTarg 0 Degree Rotation 09/23/16
  244. 6cm ZLineTarg 270 Degree Rotation 09/23/16
  245. 6cm ZLineTarg 90 Degree Rotation 09/23/16
  246. 8-07-2017
  247. 8-08-2017
  248. 8-09-2017
  249. 8-10-2017
  250. 8-11-2017
  251. 8-14-2017
  252. 8-15-2017
  253. 8-16-2017
  254. 8-18-2017
  255. 8 Channel CFD
  256. 90 degree beamline extension
  257. ACCAPP 09 PhotFis Poster
  258. ADBcrate CLAS12
  259. ADC
  260. ADC 3 Histogram Table
  261. ADC 7 Histogram Table
  262. ADS
  263. ASCII data files
  264. AW ADC 3 Histogram
  265. AW ADC 7 Histogram
  266. AW CLAS12R1
  267. AW Singles Prob Y88 2015
  268. A W CAA apparatus
  269. A W thesis
  270. A W thesis old
  271. A kind of analysis
  272. Absorbed Dose Information
  273. Abstract
  274. AccApp07
  275. Accelerator-Driven System
  276. Accelerator Driven Nuclear Reactor
  277. Accelerators Physics
  278. Accelerators Physics. Dr Kim Fall 2010
  279. Actinium Production
  280. Adding Apache Shares
  281. Admin Server
  282. Airline internet booking
  283. Airport Network Infrastructure
  284. Aka kaka
  285. Al subtracted ToF/Energy specrta
  286. All 3 detectors working
  287. All D2O Beam-down
  288. All D2O Beam-up
  289. Alpha Ionization
  290. Alpha particle simulation related
  291. Alter Phi Angles
  292. Altering Phi Angles
  293. Aluminum Converter
  294. Amex Promotion
  295. Analysis
  296. Analysis.groovy
  297. Analysis 03-26-2015
  298. Analysis of evio files
  299. Analysis of may 2017 runs
  300. Analysis scripts
  301. Angular distribution of neutrons from the photodisintegration of deuterium
  302. Anisotropic n's vs. isotropic ones
  303. Apartment
  304. Apex
  305. Api PubCLAS2000
  306. Apparatus Layout
  307. Apply, due: Jan 15 2014
  308. April
  309. April: Threshold Study
  310. April 17th 2017
  311. April 17th 2017 (PAA)
  312. Apt-Proxy
  313. ArCO2 IonizationPhysics
  314. Attenuation Measurements
  315. Attenuation Measurements NaI
  316. Au-196 5-08-22-13
  317. Au-196 Foil-08-22-13
  318. Aug 2017 ChkList
  319. August 10th 2017
  320. August 11th 2017
  321. August 14, 2007 - Cosmic Telescope
  322. August 14th 2017
  323. August 15, 2007 - Cosmic Telescope
  324. August 15th 2017
  325. August 16, 2007 - Cosmic Telescope
  326. August 17, 2007 - Cosmic Telescope
  327. August 23, 2007 - Cosmic Telescope
  328. August 24, 2007 - Cosmic Telescope
  329. August 27, 2007 - Cosmic Telescope
  330. August 28, 2007 - Cosmic Telescope
  331. August 29, 2007 - Cosmic Telescope
  332. August 30, 2007 - Cosmic Telescope
  333. August 31, 2007 - Cosmic Telescope
  334. August 8th 2017
  335. August 9th 2017
  336. B-field calculation
  337. BO-08-22-13
  338. BUILD GEMC SIMULATION.sh
  339. Back of the envelope calculation for e+/e- ratio
  340. Background
  341. BackupPC Notes
  342. Bayesian Nonparametrics
  343. BeamPipeHeating 4mmthick PbBi PositronTarget
  344. Beam Position Monitor Tests in HRRL
  345. Beam Test Apr 24 2012
  346. Beam Test Apr 26 2012
  347. Beam Test Jul 11 2012
  348. Beam Test Jul 12 2012
  349. Beam Test Jul 16 2012
  350. Beam Test Jul 17 2012
  351. Beam Test Jul 18 2012
  352. Beam Test Jul 19 2012
  353. Beam Test Jul 20 2012
  354. Beam Test Jul 23 2012
  355. Beam Test Jul 24 2012
  356. Beam Test Jul 25 2012
  357. Beam Test Jul 26 2012
  358. Beam Test Jul 27 2012
  359. Beam Test Jul 5 2012
  360. Beam Text May 17 2012
  361. Beam dump and sweep magnet G4 model
  362. Beam spot with a fancy Dan's screen
  363. Beamline Drawing 2011 J.Ellis
  364. Beamline Parts
  365. Beamline design (G. Stancari)
  366. Beamline design (Y. Kim)
  367. Beamline design drawing
  368. Benchmark GEMC Occupancy Prediction for 11GeV Electron Beam with 0T Solenoid for LH2
  369. Beta Transmission and Ionization
  370. BeulaLakeWY
  371. Bibliography
  372. Big Red
  373. Bin Shapes
  374. Bin Test
  375. Boise
  376. Books
  377. BoratedAluminum
  378. BoreShield
  379. Breakout Board Design
  380. Brem converter optimization
  381. Brems
  382. Brems Intensity Spectrum (with Collimation Factors) Plots
  383. Brems Intensity Spectrum (without Collimation Factors) Plots
  384. Bremsstrahlung lineshape for E0 = 16 MeV, Ti radiator
  385. Bremsstrahlung radiation properties, Ee=25 MeV
  386. BrianMuchilwa HW12
  387. Brian Articles
  388. Brian ToDo
  389. Brian mingw
  390. BriansRanLogbook
  391. Bubbl, Online Flowchart Too
  392. Bubbl, Online Flowchart Tool
  393. Bull
  394. Burg jeff E1 E2.py
  395. C++
  396. C-19
  397. CAA NaI HpGe CoinSetup
  398. CAD Components
  399. CAEN QDC V792
  400. CAEN TDC V 775
  401. CAEN V1290A TDC
  402. CAEN V1495 ADC
  403. CAEN V1495 IO
  404. CAEN V260 Scalr
  405. CAEN V488 TDC
  406. CAEN V775 TDC
  407. CAEN V785N ADC
  408. CAEN V792 ADC
  409. CAEN VX1190A TDC
  410. CAPSDAQ
  411. CED Verification of DC Angle Theta and Wire Correspondance
  412. CHIPS
  413. CHIPS IAC Run 5-27-08
  414. CHIPS IAC Run 5-28-08
  415. CHIPS IAC Run 5-29-08
  416. CHIPS IAC Run 5-30-08
  417. CHIPS Run Feb-2008
  418. CHIPS Run May-2008
  419. CHIPS collaboration
  420. CH 3D Printing
  421. CH 785NADC
  422. CH Calibration Sources
  423. CH Cf252 Sources
  424. CH Clean Room Renovations
  425. CH Code Repository
  426. CH DAQ2 Energy Calibration
  427. CH DD Ga
  428. CH Discriminator Dual Pulsing
  429. CH Gd Holders
  430. CH Gd Spectra
  431. CH HPGe Detector
  432. CH HPGe Efficiency
  433. CH HPGe Electronics Chain
  434. CH HPGe Log
  435. CH HPGe Work
  436. CH He3 Attenuation Measurements
  437. CH He3 Attenuation Measurements: 3 Different Cf252 Sources
  438. CH He3 Attenuation Measurements Repeated
  439. CH He3 Attenuation Measurements Revisited
  440. CH He3 Background Measurements
  441. CH He3 Pre-amp Noise Investigation
  442. CH He3 w/BorAl Gd In/Out
  443. CH High Activity Cf252
  444. CH Isotope Table
  445. CH Low Activity Cf252
  446. CH Meeting Notes
  447. CH NIM Bin Repair
  448. CH Outline
  449. CH PAS HPGe Amp Adjustment
  450. CH PAS He3 BorAl Attenuation Study
  451. CH PAS He3 Poly Boration Study
  452. CH PAS Master Logbook
  453. CH PAS Master Timeline
  454. CH PhD
  455. CH Phase II Run Plan
  456. CH Physics Questions
  457. CH Poly Density
  458. CH Preliminary Examination
  459. CH ROOT Nonuniform Binning
  460. CH Starting CODA & Reading CODA Data
  461. CH Task List
  462. CH Thesis
  463. CH Thesis Revision 1
  464. CH UNCL
  465. CH Weekly Reports
  466. CI Model 1416 Amplifier
  467. CLARA
  468. CLAS12DC ProjFactoids
  469. CLAS12R1ReadinessReview2011
  470. CLAS12R1 CosmicTestStand
  471. CLAS12R1 WireQualPic
  472. CLAS12 CleaRoomPrep 2011
  473. CLAS12 FastMC
  474. CLAS12 GEMC
  475. CLAS12 InclusiveRateEst4EG12
  476. CLAS12 MollerDataTable 12-16-2018
  477. CLAS12 R1
  478. CLAS12 R1 Progress Reports
  479. CLAS12 R1 Prototype 2-20-08
  480. CLAS12 R1 Prototype 9-16-07
  481. CLAS12 R1 S1 QA
  482. CLAS12 R1 S2 PrePotTensErr
  483. CLAS12 R1 S2 QA
  484. CLAS12 R1 S3 PrePotTensErr
  485. CLAS12 R1 S3 QA
  486. CLAS12 R1 S5 QA
  487. CLAS12 R1 S6 QA
  488. CLAS12 R1 SOW
  489. CLAS12 R1 Stringing Manual
  490. CLAS12 RateEst byWA
  491. CLAS12 SIDISpionRateEst4EG12
  492. CLAS12 Software
  493. CLAS12 r4135
  494. CLAS12 r4136
  495. CLAS12 r4139
  496. CLAS12 r4141
  497. CLAS6 Software
  498. CLAS CED
  499. CLAS apparatus
  500. CMsg

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)